Historical Documents
The following table provides access to surveys, presentations, and schematics related to the Bush-Wellborn intersection improvement project.
The following table provides access to surveys, presentations, and schematics related to the Bush-Wellborn intersection improvement project.
Pre-funding (before 2023):
This section includes tasks and documents completed prior to the project’s full funding. These historical documents provide context and reference to earlier phases of the project. Please note that since these documents were developed, additional information has been gathered, and the project plans have evolved.
Post-funding (after 2023):
This section contains documents developed after the project received full funding in 2023. These reports may be marked as “historical reference” or “current information.” Even though some of these materials are recent, the project has seen rapid development, and new insights continue to shape the direction of the work.
Documents
Survey
Pre-Funding
A survey was conducted from April 2017 to July 2017, and over 4,100 survey responses were analyzed. The purpose of the survey was to gain an understanding about:
- Concerns about the existing intersection
- The importance of construction or design features in any future intersection improvements
- Change in travel habits during construction
- Priority of elements throughout the construction process
- Specific suggestions for future intersection design and construction process.
Post-Funding
We are conducting a new survey to better understand traveler needs in the Bryan-College Station community and how to mitigate the construction effects associated with the Bush-Wellborn intersection improvement project.
Please take a quick 10-minute survey to share your valuable insights.
Schematics
Pre-Funding
TxDOT received approvals to move ahead with a proposed design in 2007, over 15 years ago. Below is a schematic of the approved design.
Pre-Funding – Intersection schematic – 2008
Pre-Funding – George Bush Cross-Section – 2008
Pre-Funding – Wellborn Cross-Section – 2008
Post-Funding
TxDOT is working towards finalizing a design and we hope to show it to you by early 2025.
Document Type | Pre-Funding (Before 2023) | Post-Funding (After 2023) |
---|---|---|
Survey | A survey was conducted from April 2017 to July 2017, and over 4,100 survey responses were analyzed. The purpose of the survey was to gain an understanding about:
Full report of survey results | We are conducting a new survey to better understand traveler needs in the Bryan-College Station community and how to mitigate the construction effects associated with the Bush-Wellborn intersection improvement project. Please click below to take a quick 10-minute survey and share your valuable insights. |
Presentations | Pre-Funding – Public Meeting – May 15 2017 | Post-Funding – TAMU Student Senate Presentation – Feb. 21 2024 Post-Funding – TAMU Faculty Senate Presentation – Aug. 12 2024 BWX Phase 3: Student Senate Presentation – Feb. 21, 2024 |
Schematics | TxDOT received approvals to move ahead with a proposed design in 2007, over 15 years ago. Below is a schematic of the approved design. Pre-Funding – Intersection schematic – 2008 Pre-Funding – George Bush Cross-Section – 2008 Pre-Funding – Wellborn Cross-Section – 2008 | TxDOT is working towards finalizing a design and we hope to show it to you by early 2025. |