• Skip to main content

Bush-Wellborn Crossing

Texas Department of Transportation
  • Home
  • Background
  • Description
  • Goals
  • Timelines
  • FAQs
  • Resources
  • News
  • Contact Us

Goals

Updated based on feedback from the first phase of public engagement.

  1. Improve Safety
    1. Reduce potential for severe or fatal collisions
    2. Minimize conflicts – trains, cars, bikes, and pedestrians
  2. Improve Mobility
    1. Improve intersection operation
    2. Improve system operation
    3. Enhance signal operations
  3. Minimize additional right-of-way needs
  4. Minimize overall cost
  5. Minimize noise, flooding, etc. other problems
  6. Landscape, walls, and structure aesthetics
  7. Connect the campus and surrounding community
  8. Shorten construction timeline
    1. Do construction as fast as possible
    2. Reduce construction traffic effects
  9. Avoid long-term full-road closures during construction

Copyright © 2023 Texas A&M Transportation Institute

Please follow and like us:
error